- The do not cost indicator means that no cost calculation is performed
for that material; however when the material is used in a bom the
material will be valuated (based on standard or planned price).
- the costing relevancy indicator in the bom is actually deciding if using the material in the cost calcualtion or not.
So the material will be evaluated in Standard cost estimation or in the cost calculation of the production order.